With ambition, knowledge, and experience, we strive to construct facilities for the future
Our extensive participation in the implementation of over 100 diverse projects in Montenegro showcases our rich experience. Each of these projects tells its own unique story, with safety, quality, and client satisfaction being integral components.
2020
35kV Transmission line Nedakus
Execution of works at the substation
Performing electrical assembly works on the construction project of the 35kV Transmission Line Nedakusi - Bistrica, Bijelo Polje
2020, 2021
TS Kličevo
Execution of works at the substation
Development of the Main Project and execution of works on the construction of a 10 kV plant in TS 110/10 kV Kličevo
2019, 2020, 2021
Bar Boljari highway
Execution of works at the substation
Carrying out works on the construction of a system for permanent power supply of the highway Bar-Boljare, section Smokovac-Mateševo
2021
STS 1×160 kVA width SN SKS 10kV
Execution of works at the substation
Procurement, delivery and execution of electrical installation works on STS 1x160 kVA with SN SKS 10kV line Rakića House - Tuzi
2016
TS Popovici
Execution of works at the substation
Carrying out works on the construction of cable line 35kV 2x (3x (XHE 49A 1x240/25, 20/35kV)) TS 110/35kV "Bar" to TS 35/10kV "Popovići" (construction includes laying of cable lines 10kV 2x(3x(XHE 49A 1x240/12, 12/20kV))
2016
Main construction project of NDTS and laying of 10kV power cable
Execution of works at the substation
Development of the Main Project for the construction of NDTS 10/0.4 kV 2x630/1x630 kVA (I phase) and laying of 10kV cable for powering NDTS and execution of high current electrical installation works according to the "turnkey" system
2015
Cable line 35kV on the building Bjeliši – Topolica and 35kV Bjeliši – Končar
Execution of works at the substation
Carrying out works on the 35kV cable line at the building Bjeliši - Topolica and 35kV Bjeliši - Končar
2015
TS 35/10kV 2x8MVA Popovići
Execution of works at the substation
Carrying out works of electrical installation of high and low current at substation TS 35/10 kV 2x8MVA "Popovići", in Bar
2014
Music center
Execution of works at the substation
Delivery, installation, connection and commissioning of the substation TS 1070.4 kV 2x630 KvA for the needs of the building during the extension, reconstruction and adaptation of the former Military Home in Podgorica, for the needs of the Music Center, the Montenegrin Cinematheque and the State Protocol
2014
NOISE TS 35/10kV
Execution of works at the substation
Carrying out works on high current electrical installations for the construction of the electric power facility (substation) Buče TS 35/10 kV
2013
TS 35/10kV Skaljari
Execution of works at the substation
Delivery and installation of lamps at the facility Trafostanica 35/10 kV Škaljari in Kotor
2021
Construction of a business building Workshop for preventive maintenance of vehicles – daily care of vehicles
Procurement and delivery of materials
Delivery of materials and execution of electrical assembly works for the construction of a business building Workshop for preventive maintenance of vehicles - daily care of vehicles in the Municipality of Pljevlja
2020, 2021
Science and Technology Park
Procurement and delivery of materials
Execution of hydrotechnical installation works, high and low current electrical installations, photovoltaic power plants, CSNU IEMP, thermotechnical installations, sprlinker installations, ventilation and smoke removal of new installations
2019
Delivery of street lamps and lighting poles in Kralja Petra Street in Pljevlja
Procurement and delivery of materials
Delivery of equipment
2021
STS 1×160 kVA with SN SKS 10kV water line Rakića House – Tuzi
Procurement and delivery of materials
Procurement, delivery and execution of electrical installation works on STS 1x160 kVA with SN SKS 10kV line Rakića House - Tuzi
2018
Construction of a part of the street in the scope of DUP Čepurci
Procurement and delivery of materials
Delivery of materials and execution of electrical works on high current installations for the equipment of the location in the scope of DUP Čepurci - construction of a part of the street.
2017
Our Voli discount store
Procurement and delivery of materials
Execution of high current works and delivery of materials
2016
Waste water treatment plant Tivat Kotor
Procurement and delivery of materials
Delivery and laying of power cable 12/20kV for the needs of the facility "Tivat - Kotor waste water treatment plant".
2016
Business facility “Bemax”
Procurement and delivery of materials
Delivery of equipment and execution of all electrical installations of high and low current at the business building "Bemax" in Podgorica.
2015
Delivery of lighting equipment for the facility “Porto Montenegro UP 1-09” in Tivat
Procurement and delivery of materials
Delivery of lamps
2015
Institute for Hydrometeorology and Seismology
Procurement and delivery of materials
Performing electrical assembly works for the needs of the Institute for Hydrometeorology and Seismology
2015
Delivery and installation of decorative lighting for the needs of the Municipality of Budva
Procurement and delivery of materials
Delivery of decorative lighting, execution of high current electrical installations
2015
Hotel „Hilton Podgorica” – Montenegro
Procurement and delivery of materials
Delivery of lighting and electrical goods
2015
Business building “Capital M” in Podgorica
Procurement and delivery of materials
Delivery of equipment and execution of electrical works of high and low current at the commercial building "Capital M" in Podgorica
2015
Delivery of materials and execution of electrical works at the Powder Materials Factory in Nikšić
Procurement and delivery of materials
Carrying out electrical works of high current and delivery of materials
2014
Delivery of external decorative lighting for the needs of Hotel “Regent” – Porto Montenegro in Tivat
Procurement and delivery of materials
Delivery of lighting
2021
Construction of a business building Workshop for preventive maintenance of vehicles – daily care of vehicles
Execution of electrical installations of high current and low current
Delivery of materials and execution of electrical assembly works for the construction of a business building Workshop for preventive maintenance of vehicles - daily care of vehicles in the Municipality of Pljevlja
2021
Porto Novi
Execution of electrical installations of high current and low current
Carrying out electrical works of high and low current at the building Porto Novi, Kumbor
2020,2021
Naučno-tehnološki park
Execution of electrical installations of high current and low current
Execution of hydrotechnical installation works, high and low current electrical installations, photovoltaic power plants, CSNU IEMP, thermotechnical installations, sprlinker installations, ventilation and smoke removal of new installations
2020,2021
Kindergarten Block VI
Execution of electrical installations of high current and low current
Carrying out electrical installation works of high and low current within the project of building a kindergarten in Block VI
2019, 2020, 2021
Bar Boljare highway, Smokovac-Mateševo section
Execution of electrical installations of high current and low current
Carrying out works on the construction of a permanent power supply system for the Bar-Boljare highway, the Smokovac-Mateševo TS 20/0.4 KV section with a 20KV cable distribution system and a remote control system for powering buildings along the highway route
2019,2020
A mixed-use business-residential building, on urban plot No. 1, consisting of floor. plots 3906/2, 3906/42 and 3906/46, KO Podgorica III in the scope of DUP “Pobrežje-zone G” – Amendments and additions in Podgorica
Execution of electrical installations of high current and low current
Carrying out electrical works of high current on the construction of a mixed-use business-residential building, on urban plot no. 1, which consists of floor. plots 3906/2, 3906/42 and 3906/46, KO Podgorica III in the scope of DUP "Pobrežje-zone G" - Amendments and additions in Podgorica
2018,2019
A collective housing facility with activities on the Urban plot number 44, DUP “Nova Varoš 2”, Podgorica.
Execution of electrical installations of high current and low current
Carrying out electrical installation work on a collective housing facility with activities on the Urban Plot No. 44, DUP "Nova Varoš 2", Podgorica.
2017,2018
Luxury villas (LV 05, LV06, LV07) Kumbor
Execution of electrical installations of high current and low current
Performing electrical installations of high current on the construction of luxury villas (from LV 05 - LV 07) in Kumbor.
2016,2017
TS 35/10kV Jezerine
Execution of electrical installations of high current and low current
Performing electrical works on the laying of 10 kV cable from TS 35/10 kV Jezerine to MBTS Base Station, Municipality of Kolašin
2021
Elektroprivreda Crne Gore AD
Execution of electrical installations of high current and low current
Performing electrical works on the ecological reconstruction of the thermal power plant "Pljevlja" - Block I
2018
Construction of a part of the street in the scope of DUP Čepurci
Execution of electrical installations of high current and low current
Delivery of materials and execution of electrical works on high current installations for the equipment of the location in the scope of DUP Čepurci - construction of a part of the street.
2018
Arena Sports Center Morača
Execution of electrical installations of high current and low current
Carrying out electrical works of high and low current at the arena building (former indoor swimming pool) Sports Center "Morača" in Podgorica.
2018
Hotel Mogren Budva
Execution of electrical installations of high current and low current
Works on adaptation and furnishing of the ground floor of the hotel "Mogren" for works on the installation of strong electricity.
2018
Club X
Execution of electrical installations of high current and low current
Performing works on high current installations at the club X building in Podgorica
2018
Building for low-density housing, DUP Tološi 2- part
Execution of electrical installations of high current and low current
Delivery of materials and execution of works on a low-density residential building, DUP Tološi 2- part
2018
Residential building of collective housing with activities at the location Stari Aerodrom
Execution of electrical installations of high current and low current
Delivery of materials and execution of works on electrical installations of high current and automatics on a residential building of collective housing with activities at the location of Stari Aerodrom
2018
Luštica bay, Municipality of Tivat (I, II and III phase)
Execution of electrical installations of high current and low current
Delivery of materials and execution of high and low current works for "Luštica bay", Municipality of Tivat (I, II and III phases)
2017
Ski Resort Kolašin 1600 – II phase
Execution of electrical installations of high current and low current
Electrical installation works at Ski Resort Kolašin 1600 - II phase
2017
Ski Resort Kolašin 1600 – I phase
Execution of electrical installations of high current and low current
Performing electrical installation works at the Ski Resort Kolašin 1600 - Phase I
2017
Road “Nova 1”, “Krak 1-1” to PR 8 and “Nova 12” to PR 6 in the scope of DUP “Zabjelo-Ljubović”, Municipality of Podgorica
Execution of electrical installations of high current and low current
Conducting electrical installation work on the roads "Nova 1", "Krak 1-1" to PR 8 and "Nova 12" to PR 6 in the scope of DUP "Zabjelo-Ljubović", Municipality of Podgorica
2017
Fisherman’s Wharf
Execution of electrical installations of high current and low current
Procurement and installation of electrical installations within Fisherman Warf - Fisherman's Village.
2017
Luštica Vila B
Execution of electrical installations of high current and low current
Carrying out electrical installation work on Villa B, Tivat
2017
Construction of a building for individual housing, UP B39, zone B, “Momišići”
Execution of electrical installations of high current and low current
Electrical installation work on the construction of a building for individual housing, UP B39, zone B, "Momišići"
2016
BC Stari Aerodrom
Execution of electrical installations of high current and low current
Construction and electrical installation work on the laying of the power cable for the Business Center "Stari Aerodrom" Podgorica.
2016
Waste water treatment plant Tivat Kotor
Execution of electrical installations of high current and low current
Delivery and laying of power cable 12/20kV for the needs of the facility "Tivat - Kotor waste water treatment plant".
2016
Hotel “Garni”- Cvijetin Brijeg, Podgorica
Execution of electrical installations of high current and low current
Electrical installation work on the construction of Hotel "Garni" - Cvijetin Brijeg, Municipality of Podgorica.
2016
Reconstruction of the building of the former Russian Embassy in Cetinje
Execution of electrical installations of high current and low current
Procurement of the necessary materials and equipment and execution of works on the construction of electrical installations of high and low current at the building of the former Russian embassy in the capital Cetinje
2016
Building for individual housing, UP B40, zone B, “Momišići”
Execution of electrical installations of high current and low current
Carrying out electrical assembly works on the construction of a building for individual housing, UP B40, zone B, "Momišići".
2016
Villas (LV01-LV04) Kumbor
Execution of electrical installations of high current and low current
Electrical installation of strong and weak current on the construction of 4 luxury villas (LV 01-LV 04) in Kumbor.
2016
Hotel in lamella PC2 Atlas Capital Center
Execution of electrical installations of high current and low current
Installation of high and low current - BMS and EMP when equipping the Hotel in the lamella PC2 Atlas Capital Center.
2016
Business premises in the Normal Company building
Execution of electrical installations of high current and low current
Delivery of materials and equipment and execution of electrical installations of high and low current at the business premises located on the 1st floor of the Normal Company building, Bulevar Svetog Petar Cetinski in Podgorica.
2016
Commercial building “Bemax”
Execution of electrical installations of high current and low current
Delivery of equipment and execution of all electrical installations of high and low current at the business building "Bemax" in Podgorica.
2015
Decorative lighting for the Municipality of Podgorica
Execution of electrical installations of high current and low current
Procurement of decorative lighting for the Municipality of Podgorica
2015
Reconstruction of Trebješka Street
Execution of electrical installations of high current and low current
Reconstruction and construction of public lighting in Trebješka Street in Nikšić.
2015
Landfill ltd
Execution of electrical installations of high current and low current
Delivery and installation of VRF systems, execution of mechanical installations for the needs of the Landfill
2015
Central Bank of Montenegro
Execution of electrical installations of high current and low current
Carrying out low current electrical work, delivery of complete equipment for evacuation and fire protection
2015
Institute for Hydrometeorology and Seismology
Execution of electrical installations of high current and low current
Performing electrical assembly works for the needs of the Institute for Hydrometeorology and Seismology
2015
Residential and commercial building in Podgorica
Execution of electrical installations of high current and low current
Performing electrical installation work on a residential building
2015
Customs ltd
Execution of electrical installations of high current and low current
Carrying out low current electrical installation works, setting up a sound system, thermalizing the optical cable at the Carina facility
2015
Underground cable 0.4 kv Pljevlja
Execution of electrical installations of high current and low current
Designing and execution of all electrical installations of high and low current for the needs of FC Dstribucija-ED Pljevlja - Construction of underground water 0.4 Kv-"Naselje Potrlica" according to the "turnkey" system.
2015
Adaptation of the MUP facility “Limenka” of Montenegro in Podgoric
Execution of electrical installations of high current and low current
Carrying out electrical installation works on the adaptation of the building of the MUP "Limenka" of Montenegro in Podgorica.
2015
Voli in Cetinje
Execution of electrical installations of high current and low current
Performing electrical assembly works at the VOLI hypermarket in Cetinje
2015
Business building “Capital M” in Podgorica
Execution of electrical installations of high current and low current
Delivery of equipment and execution of electrical works of high and low current at the commercial building "Capital M" in Podgorica
2015
Factory of Powder materials
Execution of electrical installations of high current and low current
Delivery of materials and execution of electrical works at the Powder Materials Factory in Nikšić
2014
Residential and commercial building in Podgorica
Execution of electrical installations of high current and low current
Carrying out works on low-current electrical installations and signaling and fire alarm systems.
2014
Adaptation of King Nikola’s Castle
Execution of electrical installations of high current and low current
Carrying out electrical assembly works on the adaptation of King Nikola's Castle on Kruševac in Podgorica
2014
Student dormitory
Execution of electrical installations of high current and low current
Renovation of the New Student Dormitory in Podgorica
2013
TS 35/10kV Škaljari
Execution of electrical installations of high current and low current
Delivery and installation of lamps at the facility Trafostanica 35/10 kV Škaljari in Kotor.
2013
Parking garage
Execution of electrical installations of high current and low current
Delivery and installation of the entire system for powering garage lighting via photovoltaic cells - Hybrid system for powering consumers, at the Parking garage facility in Bijelo Polje.
2013
Reconstruction of public lighting in Nedeljka Merdovića Street in Bijelo Polje
Execution of electrical installations of high current and low current
Reconstruction of public lighting in Nedeljka Merdovića Street in Bijelo Polje, performance of high current and public lighting works
2013
Parking garage in Bijelo Polje
Execution of electrical installations of high current and low current
Performing electrical installation work on the parking garage in Bijelo Polje
2017
Reconstruction of the Square in Njeguši, Municipality of Cetinje
Execution of works on traffic roads and public lighting
Performing electrical works on the reconstruction of the Square in Njeguši, Municipality of Cetinje
2019, 2020, 2021
Highway Bar- Boljare, section Smokovac-Mateševo
Execution of works on traffic roads and public lighting
Carrying out works on the construction of a permanent power supply system for the Bar-Boljare highway, the Smokovac-Mateševo TS 20/0.4 KV section with a 20KV cable distribution system and a remote control system for powering buildings along the highway route
2019, 2020
Construction of sections I and III of the “Southwest Bypass” road
Execution of works on traffic roads and public lighting
Performing electrical assembly works
2020
Reconstruction of the main road Podgorica – Tuzi
Execution of works on traffic roads and public lighting
Performing electrical installation works
2019
Carrying out electrical installation for construction of road Nova 14 DUP “Ljubović” – Zabjelo
Execution of works on traffic roads and public lighting
Performing electrical installation works
2019
The road with the associated parking lot on UP: D, E and F – zone VII in the scope of DUP-Konik
Execution of works on traffic roads and public lighting
Performing electrical works of high and low current on the road with the associated parking lot on UP: D, E and F - zone VII in the scope of DUP-Konik
2019
Construction of road MR-1, second phase
Execution of works on traffic roads and public lighting
Performing works on electrical installations of high and low current
2019
Delivery of street lamps and lighting poles in Kralja Petra Street in Pljevlja
Execution of works on traffic roads and public lighting
Delivery of equipment
2019
Reconstruction of lighting in the area of the capital Podgorica and municipalities within the capital Golubovci and Tuzi
Execution of works on traffic roads and public lighting
Dismantling, assembly and maintenance of lamps
2019
Reconstruction of the road Plav-Vojno selo
Execution of works on traffic roads and public lighting
Performing electrical assembly works on the reconstruction of the road Plav-Vojno selo
2018
Carrying out work on the installation of external lighting fixtures at the “Porto Novi” facility in Kumbor
Execution of works on traffic roads and public lighting
Carrying out work on the installation of external lighting fixtures at the "Porto Novi" facility in Kumbor
2018
Reconstruction of the main road M-2 Petrovac-Podgorica, II phase: intersection with bypass Golubovci
Execution of works on traffic roads and public lighting
Delivery of materials and execution of works on electrical installations of high current and automation on the reconstruction of the main road M-2 Petrovac-Podgorica, phase II: intersection with ObilaOznica Golubovci
2017
Construction of lighting in Baja Pivljaninana Street in Cetinje
Execution of works on traffic roads and public lighting
execution of electrical installations of high current on the construction of lighting in Baja Pivljaninana Street in Cetinje
2016
Carrying out works on the construction of a part of the road with parking lots called “Ulica 4” in the scope of the DUP “Zabjelo 9” in Podgorica
Execution of works on traffic roads and public lighting
Carrying out strong current works on the construction of a part of the road with parking lots called "Ulica 4" in the scope of the DUP "Zabjelo 9" in Podgorica
2016
Public lighting in the Municipality of Herceg Novi
Execution of works on traffic roads and public lighting
Dismantling of old and installation of new liras, as well as dismantling of existing lamps for public lighting and installation of new LED lamps
2016
Lighting of the parking lot of the “Plavi horizonti” hotel in the territory of the Municipality of Tivat
Execution of works on traffic roads and public lighting
Performing electrical installations of high current on the lighting of the parking lot of the hotel "Plavi horizonti"
2015
Construction of public lighting and electric power installations ul. Radosav Burić in Podgorica
Execution of works on traffic roads and public lighting
Carrying out high current electrical works
2014
Construction of the roundabout Bulevar V proleterska and Josip Broz in Podgorica
Execution of works on traffic roads and public lighting
Execution of electrical works
2014
Delivery and installation of decorative street lamps of vintage design for the city of Cetinje
Execution of works on traffic roads and public lighting
Delivery and installation of decorative street lamps, execution of high current electrical works
2014
Public lighting on the part of the local road Sekulići – railroad crossing – Gorica, Municipality of Danilovgrad
Execution of works on traffic roads and public lighting
Carrying out works of electrical installations of high current, laying cables, construction of public lighting
2018
Construction of a part of the street in the scope of DUP Čepurci
Execution of works on traffic roads and public lighting
Delivery of materials and execution of electrical works on high current installations for the equipment of the location in the scope of DUP Čepurci - construction of a part of the street
2017
Road “Nova 1”, “Krak 1-1” to PR 8 and “Nova 12” to PR 6 in the scope of DUP “Zabjelo-Ljubović”, Municipality of Podgorica
Execution of works on traffic roads and public lighting
Conducting electrical installation work on the roads "Nova 1", "Krak 1-1" to PR 8 and "Nova 12" to PR 6 in the scope of DUP "Zabjelo-Ljubović", Municipality of Podgorica
2014
Reconstruction and construction of public lighting in Ul. Vojislav Šćepanović in Mojkovac
Execution of works on traffic roads and public lighting
Carrying out works of electrical installations of high current, laying cables, construction of public lighting
2015
Reconstruction of Trebješka Street
Execution of works on traffic roads and public lighting
Reconstruction and construction of public lighting in Trebješka Street in Nikšić
2014
Reconstruction of part of Serdar Jola Piletić Street in Podgorica
Execution of works on traffic roads and public lighting
Carrying out works of electrical installations of high current, laying cables, construction of public lighting
2014
Reconstruction of the V Proleterska and Josip Broz intersections
Execution of works on traffic roads and public lighting
Carrying out works of electrical installations of high current, laying cables, construction of public lighting
2014
Roundabout at the entrance to the city of Cetinje
Execution of works on traffic roads and public lighting
Execution of electrical installations of high current, delivery and installation of poles and lamps
2014
Dalmatinska street in Podgorica
Execution of works on traffic roads and public lighting
Delivery of consoles, poles and reflectors for public lighting
2014
Lighting of the Roundabout in Nikšić
Execution of works on traffic roads and public lighting
Delivery of consoles, poles and reflectors for public lighting
2014
Reconstruction of Palih Partizanki Street in the Municipality of Kolašin
Execution of works on traffic roads and public lighting
Execution of high current works, laying of cables, construction of lighting
2013
Performing electrical installations of high current, namely: moving existing cables and lighting installations for the construction of access roads to parking garages with accompanying installations, Municipality of Bijelo Polje
Execution of works on traffic roads and public lighting
Execution of high current electrical installation works
2013
Reconstruction of public lighting in Nedeljka Merdovića Street in Bijelo Polje
Execution of works on traffic roads and public lighting
Execution of electrical installations of high current and construction of lighting
2012
Reconstruction of public lighting in the city center (Capital of Cetinje)
Execution of works on traffic roads and public lighting
Execution of high current works, laying of cables, construction of lighting
2020,2021
Science and Technology Park
Execution of works in the field of renewable energy sources
Execution of hydrotechnical installation works, high and low current electrical installations, photovoltaic power plants, CSNU IEMP, thermotechnical installations, sprlinker installations, ventilation and smoke removal of new installations
2017,2018
Windpark Možura
Execution of works in the field of renewable energy sources
Development of the Main Project and execution of works on the construction of TS 10/0.4 kV Možura with decaying cable lines, on the territory of the Municipality of Ulcinj. Works on the production of cable lines, grounding of wind generators, as well as works on the production of optical installations.
2012,2013
115 photovoltaic systems for 115 towns in the territory of Montenegro
Execution of works in the field of renewable energy sources
Installation of photovoltaic panels for the production of electricity, execution of electrical installation works.
2014
First solar plan- Eko building of UN organization in Podgorica
Execution of works in the field of renewable energy sources
Carrying out works of electrical installations of high current, delivery of photovoltaic panels for the production of electricity.
2020
MHE „Skrbuša”
Execution of works in the field of renewable energy sources
Carrying out all types of works on the construction of an electric power facility for the production of electricity, a small hydroelectric power plant "Skrbuša"
2020
Winery
Execution of works in the field of renewable energy sources
Procurement and installation of photovoltaic solar modules and related equipment
2018
mHE „Bistrica Lipovska „ Kolašin
Execution of works in the field of renewable energy sources
Execution electrical installations works of high current
2017
Business and residential building Podgorica
Execution of works in the field of renewable energy sources
Delivery, installation and commissioning of solar systems for supplying electricity to the building
2015
Hotel “Delfin”
Execution of works in the field of renewable energy sources
Delivery and installation of steel structures and substructures for solar photovoltaic panels, as well as delivery and installation of solar collectors for hot sanitary water heating for the "DELFIN" hotel in Bijela.
2015
Residential building Pobori, Budva
Execution of works in the field of renewable energy sources
Delivery and assembly of the supporting structure for the photovoltaic system, execution of high current electrical installations, system testing and commissioning.
2014
Photovoltaic panel project in the municipality of Šavnik
Execution of works in the field of renewable energy sources
Performance of high current electrical installations, delivery and installation of photovoltaic panels for electricity production in the Municipality of Šavnik