Slide 1
Slide 1
Slide 1
Delivered
Performing works on electrical installations of high and low current.
Year
2022
The implementation of the elementary school project in Tološi included the construction of 27 classrooms and a large-capacity gymnasium for various types of recreational and entertainment content. The arrangement of the school and yard included the paving of the square, the construction of a trim track and open fields, as well as the equipment of the entire area with urban furniture and landscaping. According to the current laws and regulations in the field of school education, the school is designed for 1,200 students.