Delivered
Works on the production of cable lines, grounding of wind generators and optics installation.
Year
2019
The Možura wind farm is located on the very border between the municipalities of Ulcinj and Bar and is the second largest wind farm in Montenegro. Its construction began in 2017 and was completed at the end of 2019. A total of 23 wind turbines were built with a total capacity of 46 MW, while the annual electricity production is expected to be around 120 GWH.
Photo source:
www.bemax.me/project/vjetropark-mozura/